Saturday, October 23, 2010

Cool Mathematical Breakthrough

super everything, but it is still better

So, once in a week rum, which is an awful lot happened.

First Monday is a great moment: the staircase was there. This does make the house livable as much, if not always a ladder to climb to the upper floor needs. And tada because it is:

easy to see the stairs from below ...


... and a view from above.

Tuesday were then the sanitary guys busy, another step towards feeding:

bathroom downstairs

shower fittings below

bathtub :-)


, everything from the bathroom above

Then came the doors on Thursday. And we were happy again, especially on the doors to the kitchen and living room with light Detail:


Otherwise, the doors are white rather unspectacular:


The only thing that has not happened even though it was on schedule was the final installation electric ... since everything looks even more like always, so the company probably better was not there. So it can only be "better".

We have witnessed on Monday a huge surprise than our Gala-makers have begun. After a week of work, it now looks as follows from:

The clarification Viebrock drainage around the house is around .

We have an initial pedestal

The road to the house and the parking lots are already visible

also the terrace. Great, keep it up next week!

Next Woche kommt dann hoffentlich die Elektro - Endinstallation , ansonsten wird versiegelt, Teppich verlegt, gereinigt und Fenster eingestellt. Und dann ist fertig - Viebrock -fertig und Vor- und Endabnahme in der ersten Novemberwoche. Unglaublich, wie schnell die 3 Monate Bauzeit rum sind.


Saturday, October 16, 2010

How Much Is A Johnson Brothers China Set Worth

It is comfortable ...

...in unserem Häuschen.

Diese Woche wurden der Fußboden gefließt und die Maler haben das komplette Haus tapeziert und gestrichen. Alle haben wirklich super Arbeit geleistet .

Zudem haben wir nach langem hin und her nun finally, the cable socket in the house. Let's see how long it now takes some time before we also know that in Germany and our cable connections ummeldet ...

it, then to see some pictures, even if the colors are not always just as in nature:


The entrance area, tile in sand matt and wall in Terra

look at HWR , kitchen and living room, everywhere below, the same tiles. In the living room floor is still laid

Our guest bathroom, the wall color is Mandarin (in Original a fresh yellow, comes out of here not so)

The kitchen - here are the old white walls, the kitchen still enough color comes in


The living room in Cognac

come here from Monday through our staircase - you can already see that the color of the floor below to continue upwards. The slope is, however, old white ...


... just like the rest of the hallway above and the entire wall on which will be the stairs (I somehow forgot to photograph ... but is it safe next week see when we present our stair)


Our bedroom, complete in apricot, in Drembel darker than the rest coming over next week then up everywhere carpet.


The rest of the bedroom ...


The guest room in grenade - also in white / black combination. The wall at the window and the opposite it are white. The wall opposite the slope is also in garnet.


Our work in the fresh Lapis , Also on two walls, as in the guest rooms ...

... and the rest is white.

Our personal highlight, together with the bottom floor is the bathroom above ... Mocha wood-effect tiles. The walls are also more antique white.


And here the tub, behind tiles with wave optics - total class !

And the last photo makes the heart beat faster and show the developers that make dehumidifiers all the work in the hallway this morning it was 59% humidity - Since one can not but complain in the new building. We'll see how that develops when the Bautrockner end of next week off ... As mentioned

comes Monday / Tuesday the stairs, then stand the final installation electrical, plumbing and heating to come on Friday and the doors. It is therefore more homely!

Saturday, October 9, 2010

Audible Alarm Systems

house connections Part 2

after us at the beginning of the week, the words to make notes, were missing at last report, what has happened since the last post:

On Friday, we actually get two electric meters, thereby providing the breather on run full speed and with the Floor warm up could not start. It was really warm in our house. :)

On Sunday, however, we noticed that water had formed on the ceiling of the bay ... So on Monday raised our construction manager on it. Currency: First keep in mind, but let them know if it does not improve, then looked from the outside whether the insulation up was fully down or has moved away there was.

early Monday was then our painter, who may in the coming week decorating and painters, as to get everything to look and to give us his color chart. Anticipation with us for the evening, when it came to choosing colors is final. Then have the tile started on Monday, which we have but only on the way to work on the highway in our direction to see go. Sorry, there was clear on Monday that shift the floor tiles for a week. Through the chaos of the current counter screed simply was not dry enough. Too bad, but can not be helped.

Just before we made our way to work, but was still on joy, because our civil contractors approached, to make the sewage and storm water connections. Should pretty much be done before the week, but we're not vindictive . Is, after all, a subject less, behind which the day hertelefonieren needs.

Unfortunately, the joy lasted only one working. As the evening we were back at the house we could first observe a large excavators, and many trenches.

Our house has - at least from the front - reminiscent of a medieval castle, which was well protected against intruders. We, therefore, in the dark with our flashlight armed carefully crept around the house. Behind the house then we have had a stroke when we saw the following:


A visually beautiful manhole cover - right there, where later times the lawn to have a few inches beyond the end of the future patio. A dream. And to It should be noted shortly, this is not the sewage manhole that is outside the house. No, that should dispose of our rain water. Fantastic ... planned Viebrock and we asked the civil contractors was a trench . Which in turn would not look so - so that's why she should be. Of course you can make Monday night at 8 anyway because nothing except be frustrated . But that is part of the owners life was also sometimes do so.

Inside we could then at least feel relieved of the tile had started in the guest bathroom and hung the first wall tiles.

After the issue at home vs. trench. Shaft / Gullideckel have said something, then we have actually made from discussing colors. On results is silent on this point, a little suspense until the next weekend where hopefully we can then show the results must remain so.

The Tuesday would start on a telephone conversation with the civil contractors. Well, one could trench Disturbing, but that would then cost more. War we do not care at the moment, easy. When we heard later, we came out almost non-stop laughing. We had feared a four-figure sum, far from it, the extra costs are a low three-digit Amount. Then why not you say so??

Tuesday and Wednesday were then cleared all traces of the house follow-up action that plot looks normal again. Nett was the decrease in residential lines through the city of Lüneburg. The responsible staff should feel have wondered why the pipe that brings out the dirty water out of the house was black and not orange ... The technical solution that was used Viebrock him not well known, that a certificate had to be submitted ... but now everything should be fine.

The tiler has continued to work on Tuesday, Wednesday and Thursday was quiet on the site (as quiet as it is with can be building dryers) and Friday were then placed back tiles. The intermediate result on Friday was as follows:

shower down


wall in the guest bathroom

bathroom upstairs

shower above


and the bathtub - this needs to be reworked a bit ...

Ah yes, the wet spot is not gone yet, on Monday our construction manager comes with a builder to look for the cause. Hopefully the problem can easily solved be, so that everything dries quickly and can paper our painter ...