Monday, December 27, 2010

Can Bamboo Grow In Iceland

The house is ....

... long as we have reported anything.

In the meantime, we have moved and have our first Christmas celebrated in-house. All that had been visited have expressed sufficient admiration (which was not the fact that we stood behind them with sharp knives;)).

will it be enough for the blog at this point. From now on, our house is our private affair. Who us in "real life " knows and wants to see the house like done ( naja, so ready, as it's just missing, or lamps, curtains, garden, etc) is welcome to call us and arrange an appointment , we also show how it looks finished.

All readers who are interested in building with Viebrock have said is only this: We would build again with Viebrock . Sure go there once a few things wrong, or electricians will not come when they should, but there is always someone who cares. We are very satisfied! Thank you to this point again to all of Viebrock and craft industries, which have ensured that the house was from an idea to be our new home!

Sun, so we say goodbye, it was an exciting year - and we wish everyone a happy and a happy 2011!

Saturday, October 23, 2010

Cool Mathematical Breakthrough

super everything, but it is still better

So, once in a week rum, which is an awful lot happened.

First Monday is a great moment: the staircase was there. This does make the house livable as much, if not always a ladder to climb to the upper floor needs. And tada because it is:

easy to see the stairs from below ...


... and a view from above.

Tuesday were then the sanitary guys busy, another step towards feeding:

bathroom downstairs

shower fittings below

bathtub :-)


, everything from the bathroom above

Then came the doors on Thursday. And we were happy again, especially on the doors to the kitchen and living room with light Detail:


Otherwise, the doors are white rather unspectacular:


The only thing that has not happened even though it was on schedule was the final installation electric ... since everything looks even more like always, so the company probably better was not there. So it can only be "better".

We have witnessed on Monday a huge surprise than our Gala-makers have begun. After a week of work, it now looks as follows from:

The clarification Viebrock drainage around the house is around .

We have an initial pedestal

The road to the house and the parking lots are already visible

also the terrace. Great, keep it up next week!

Next Woche kommt dann hoffentlich die Elektro - Endinstallation , ansonsten wird versiegelt, Teppich verlegt, gereinigt und Fenster eingestellt. Und dann ist fertig - Viebrock -fertig und Vor- und Endabnahme in der ersten Novemberwoche. Unglaublich, wie schnell die 3 Monate Bauzeit rum sind.


Saturday, October 16, 2010

How Much Is A Johnson Brothers China Set Worth

It is comfortable ...

...in unserem Häuschen.

Diese Woche wurden der Fußboden gefließt und die Maler haben das komplette Haus tapeziert und gestrichen. Alle haben wirklich super Arbeit geleistet .

Zudem haben wir nach langem hin und her nun finally, the cable socket in the house. Let's see how long it now takes some time before we also know that in Germany and our cable connections ummeldet ...

it, then to see some pictures, even if the colors are not always just as in nature:


The entrance area, tile in sand matt and wall in Terra

look at HWR , kitchen and living room, everywhere below, the same tiles. In the living room floor is still laid

Our guest bathroom, the wall color is Mandarin (in Original a fresh yellow, comes out of here not so)

The kitchen - here are the old white walls, the kitchen still enough color comes in


The living room in Cognac

come here from Monday through our staircase - you can already see that the color of the floor below to continue upwards. The slope is, however, old white ...


... just like the rest of the hallway above and the entire wall on which will be the stairs (I somehow forgot to photograph ... but is it safe next week see when we present our stair)


Our bedroom, complete in apricot, in Drembel darker than the rest coming over next week then up everywhere carpet.


The rest of the bedroom ...


The guest room in grenade - also in white / black combination. The wall at the window and the opposite it are white. The wall opposite the slope is also in garnet.


Our work in the fresh Lapis , Also on two walls, as in the guest rooms ...

... and the rest is white.

Our personal highlight, together with the bottom floor is the bathroom above ... Mocha wood-effect tiles. The walls are also more antique white.


And here the tub, behind tiles with wave optics - total class !

And the last photo makes the heart beat faster and show the developers that make dehumidifiers all the work in the hallway this morning it was 59% humidity - Since one can not but complain in the new building. We'll see how that develops when the Bautrockner end of next week off ... As mentioned

comes Monday / Tuesday the stairs, then stand the final installation electrical, plumbing and heating to come on Friday and the doors. It is therefore more homely!

Saturday, October 9, 2010

Audible Alarm Systems

house connections Part 2

after us at the beginning of the week, the words to make notes, were missing at last report, what has happened since the last post:

On Friday, we actually get two electric meters, thereby providing the breather on run full speed and with the Floor warm up could not start. It was really warm in our house. :)

On Sunday, however, we noticed that water had formed on the ceiling of the bay ... So on Monday raised our construction manager on it. Currency: First keep in mind, but let them know if it does not improve, then looked from the outside whether the insulation up was fully down or has moved away there was.

early Monday was then our painter, who may in the coming week decorating and painters, as to get everything to look and to give us his color chart. Anticipation with us for the evening, when it came to choosing colors is final. Then have the tile started on Monday, which we have but only on the way to work on the highway in our direction to see go. Sorry, there was clear on Monday that shift the floor tiles for a week. Through the chaos of the current counter screed simply was not dry enough. Too bad, but can not be helped.

Just before we made our way to work, but was still on joy, because our civil contractors approached, to make the sewage and storm water connections. Should pretty much be done before the week, but we're not vindictive . Is, after all, a subject less, behind which the day hertelefonieren needs.

Unfortunately, the joy lasted only one working. As the evening we were back at the house we could first observe a large excavators, and many trenches.

Our house has - at least from the front - reminiscent of a medieval castle, which was well protected against intruders. We, therefore, in the dark with our flashlight armed carefully crept around the house. Behind the house then we have had a stroke when we saw the following:


A visually beautiful manhole cover - right there, where later times the lawn to have a few inches beyond the end of the future patio. A dream. And to It should be noted shortly, this is not the sewage manhole that is outside the house. No, that should dispose of our rain water. Fantastic ... planned Viebrock and we asked the civil contractors was a trench . Which in turn would not look so - so that's why she should be. Of course you can make Monday night at 8 anyway because nothing except be frustrated . But that is part of the owners life was also sometimes do so.

Inside we could then at least feel relieved of the tile had started in the guest bathroom and hung the first wall tiles.

After the issue at home vs. trench. Shaft / Gullideckel have said something, then we have actually made from discussing colors. On results is silent on this point, a little suspense until the next weekend where hopefully we can then show the results must remain so.

The Tuesday would start on a telephone conversation with the civil contractors. Well, one could trench Disturbing, but that would then cost more. War we do not care at the moment, easy. When we heard later, we came out almost non-stop laughing. We had feared a four-figure sum, far from it, the extra costs are a low three-digit Amount. Then why not you say so??

Tuesday and Wednesday were then cleared all traces of the house follow-up action that plot looks normal again. Nett was the decrease in residential lines through the city of Lüneburg. The responsible staff should feel have wondered why the pipe that brings out the dirty water out of the house was black and not orange ... The technical solution that was used Viebrock him not well known, that a certificate had to be submitted ... but now everything should be fine.

The tiler has continued to work on Tuesday, Wednesday and Thursday was quiet on the site (as quiet as it is with can be building dryers) and Friday were then placed back tiles. The intermediate result on Friday was as follows:

shower down


wall in the guest bathroom

bathroom upstairs

shower above


and the bathtub - this needs to be reworked a bit ...

Ah yes, the wet spot is not gone yet, on Monday our construction manager comes with a builder to look for the cause. Hopefully the problem can easily solved be, so that everything dries quickly and can paper our painter ...

Wednesday, September 29, 2010

How To Properly Make A Coyote Snare

house connections ...

... a nightmare for many owners as you can read in the Construction job again and again. Often it works well not as you imagine it.

We made it quite interesting to see how / if it works for us. Monday morning, it was then also the extent, electricity and water connections and phone should be put into the house. While we had with our construction manager our usual Monday-morning-to-7 meeting, came the boys . When asked when they would be ready for the answer came, so today (ie Monday) afternoon ... Well, to be beautiful, but unfortunately also somewhat problematic. We were on Monday still no box, sockets, etc. were all still in plaster, and above all, we had no electricity meter. Once our house is connected to the public network site power is removed. Without counter but still no electricity in the house - and no electricity no Bautrockner , ready to dry our house, not a screed program the floor heating ... Well, what the heck. Everything must stop dry Sun The electrician could then also there yesterday and been busy, but they are quite finished yet - and a counter, we still do not have. But for now since Dehumidifiers that are already connected to the mains - so that they run the counter and order as soon as we have electricity. Latest stand is that we get the counters Friday morning.

Our HWR is now quite full, today is the Fighter been added, as is the outdoor unit. We've got a bit a guilty conscience, because our neighbors watch from their terrace directly from now on our external unit. But as one can do nothing ...

Sun 's now looking from in and around the HWR :

Our heat pumps ...

And our beautiful outdoor unit


connections and the cabinet

The cabinet without counter inside

The only thing that worked not so correctly, that the house connection people should also take the cable with cable in the trench. They wanted to do despite previous promise not after all. Well, then aufbuddeln must hold the cable man again everything ...

dirt and rain water should then follow this week ... We are excited.

Moreover, we are the subject of landscaping -Bauer newly taken up once again and now with Viebrock help again changed the landscaping -Bauer. It just always has the confidence to be there - and if you Viebrock -speed, accuracy, etc. is used, turn to some problems have come along since craftsmen.

, enough for today from the building, now watch the next disaster Werder Milan:)

Sunday, September 26, 2010

Pitcures Of A Womans Breast

Zabayone, Cotta, Cream and plum cake

This week was marked by much "action" on top and a very calm finish.

like last post was written on Monday and Tuesday, the sanitary guys on it and have baths, showers and underfloor heating installed. A yes there were some pictures on Monday already. From Tuesday

was then poured and the floor . First the top then the bottom and Wednesday. The following impressions are from Tuesday evening :


This plate kept us honest builders, of course, already out on Tuesday


The floor in the living room from the outside so ...

And top floor - good that the framework was still

Wednesday evening we found very pleased that now our clinker is also jointed. And therefore we were able to use the framework to use to fan the joints. At the same time we have with our new acquisitions, a spade and pruning shears are busy with our "garden". There is still work to be done and that there is a wide hedge of various shrubs and trees running diagonally across the site. This hedge comes from old times when the sites were designed in the development area or otherwise. Would be really handy if this would be the property line, but so, unfortunately, very impractical ...

Friday was then the scaffolding finally broken down and we were able to see our house for the first time free-standing.

Tadaaa :



Up close one can see how important the task of the coming week, namely the drainage. The rain of the day leads to an impressive reservoirs:

next week then the week of house connections, since your fingers crossed that everything works!

outer one can also recognize where the outdoor unit should get there the heat pump:


Inside we were of course today, as we have no longer held there. Puh , what is one Say that a sauna. The humidity caused by the screed has come into the house, is quite remarkable. The first thought when unlocking was "oh, that's really high now." Sun 20 cm on the bottom plate in addition to notes on it quite clearly.

Upstairs there are much less cm, but here you can see the ground up times good.

Our HWR also fills up more and more that black the way, is the cable from cable Germany that is then next weeks hopefully moved along with the house connections and we will deliver television, telephone and Internet.

Inside was also clear that still have the electrical installation missing, the sockets are still in plaster, is a switch box is not so still Let's see when that comes, not that we have first a household connection, and then until the cans are exposed ...

Well, what do we tell the clients actually the title of the blog entry ? Quite simply, we have used the Saturday to the hardware store our confidence some color samples and a role woodchip wallpaper bought - and then we painted. Just to even more than just little color cards have and imagine to how the colors appear on the surface. Zabayone has unfortunately lost, but Cotta and Cream please us very much for our bedroom. Let's see how we can find similar colors to the painter.

Oh, and plum cake is of course no color but just a reference to the fall. A wonderful smell of baking yesterday pulled through the apartment and tasty it is. If this smell attracts by our house we will live for many months there. The first Back is rather the smell of his Christmas cookies:)

The other schedule is otherwise as follows:
Next
40th week House connections KW tiles
41st KW Decorators
42nd KW wooden staircase, final installation electrical / heating / sanitation , interior doors
43rd KW Carpet Cleaning and snacks including (if only for that we love Viebrock !)
44th KW delivery, floor and kitchen
45th KW catchment

Wow, it's the opposite end :)))