house connections ...

... a nightmare for many owners as you can read in the Construction job again and again. Often it works well not as you imagine it.

We made it quite interesting to see how / if it works for us. Monday morning, it was then also the extent, electricity and water connections and phone should be put into the house. While we had with our construction manager our usual Monday-morning-to-7 meeting, came the boys . When asked when they would be ready for the answer came, so today (ie Monday) afternoon ... Well, to be beautiful, but unfortunately also somewhat problematic. We were on Monday still no box, sockets, etc. were all still in plaster, and above all, we had no electricity meter. Once our house is connected to the public network site power is removed. Without counter but still no electricity in the house - and no electricity no Bautrockner , ready to dry our house, not a screed program the floor heating ... Well, what the heck. Everything must stop dry Sun The electrician could then also there yesterday and been busy, but they are quite finished yet - and a counter, we still do not have. But for now since Dehumidifiers that are already connected to the mains - so that they run the counter and order as soon as we have electricity. Latest stand is that we get the counters Friday morning.

Our HWR is now quite full, today is the Fighter been added, as is the outdoor unit. We've got a bit a guilty conscience, because our neighbors watch from their terrace directly from now on our external unit. But as one can do nothing ...

Sun 's now looking from in and around the HWR :

Our heat pumps ...

And our beautiful outdoor unit


connections and the cabinet

The cabinet without counter inside

The only thing that worked not so correctly, that the house connection people should also take the cable with cable in the trench. They wanted to do despite previous promise not after all. Well, then aufbuddeln must hold the cable man again everything ...

dirt and rain water should then follow this week ... We are excited.

Moreover, we are the subject of landscaping -Bauer newly taken up once again and now with Viebrock help again changed the landscaping -Bauer. It just always has the confidence to be there - and if you Viebrock -speed, accuracy, etc. is used, turn to some problems have come along since craftsmen.

, enough for today from the building, now watch the next disaster Werder Milan:)

Sunday, September 26, 2010

Pitcures Of A Womans Breast

Zabayone, Cotta, Cream and plum cake

This week was marked by much "action" on top and a very calm finish.

like last post was written on Monday and Tuesday, the sanitary guys on it and have baths, showers and underfloor heating installed. A yes there were some pictures on Monday already. From Tuesday

was then poured and the floor . First the top then the bottom and Wednesday. The following impressions are from Tuesday evening :


This plate kept us honest builders, of course, already out on Tuesday


The floor in the living room from the outside so ...

And top floor - good that the framework was still

Wednesday evening we found very pleased that now our clinker is also jointed. And therefore we were able to use the framework to use to fan the joints. At the same time we have with our new acquisitions, a spade and pruning shears are busy with our "garden". There is still work to be done and that there is a wide hedge of various shrubs and trees running diagonally across the site. This hedge comes from old times when the sites were designed in the development area or otherwise. Would be really handy if this would be the property line, but so, unfortunately, very impractical ...

Friday was then the scaffolding finally broken down and we were able to see our house for the first time free-standing.

Tadaaa :



Up close one can see how important the task of the coming week, namely the drainage. The rain of the day leads to an impressive reservoirs:

next week then the week of house connections, since your fingers crossed that everything works!

outer one can also recognize where the outdoor unit should get there the heat pump:


Inside we were of course today, as we have no longer held there. Puh , what is one Say that a sauna. The humidity caused by the screed has come into the house, is quite remarkable. The first thought when unlocking was "oh, that's really high now." Sun 20 cm on the bottom plate in addition to notes on it quite clearly.

Upstairs there are much less cm, but here you can see the ground up times good.

Our HWR also fills up more and more that black the way, is the cable from cable Germany that is then next weeks hopefully moved along with the house connections and we will deliver television, telephone and Internet.

Inside was also clear that still have the electrical installation missing, the sockets are still in plaster, is a switch box is not so still Let's see when that comes, not that we have first a household connection, and then until the cans are exposed ...

Well, what do we tell the clients actually the title of the blog entry ? Quite simply, we have used the Saturday to the hardware store our confidence some color samples and a role woodchip wallpaper bought - and then we painted. Just to even more than just little color cards have and imagine to how the colors appear on the surface. Zabayone has unfortunately lost, but Cotta and Cream please us very much for our bedroom. Let's see how we can find similar colors to the painter.

Oh, and plum cake is of course no color but just a reference to the fall. A wonderful smell of baking yesterday pulled through the apartment and tasty it is. If this smell attracts by our house we will live for many months there. The first Back is rather the smell of his Christmas cookies:)

The other schedule is otherwise as follows:
Next
40th week House connections KW tiles
41st KW Decorators
42nd KW wooden staircase, final installation electrical / heating / sanitation , interior doors
43rd KW Carpet Cleaning and snacks including (if only for that we love Viebrock !)
44th KW delivery, floor and kitchen
45th KW catchment

Wow, it's the opposite end :)))

Monday, September 20, 2010

How Period Should Look

mid-term results of the 36th

half wars in the last week ... and how one of football knows, it was also a small half-time.

The cleaner was already two weeks ago because the painter has painted the outside good (remarkably well in this weather last week) (probably with a view to the sky) during the grouting probably only come this week. According to schedule, they also have time until Wednesday. The electrician was probably there and the cabling according to the wishes of our construction manager changed things, but are the outlets & Co. still tucked nicely under the plaster. The plaster is also nice for dried. In the upstairs room where the shutters he lacks is the driest, who would have thought it :-)

construction manager meeting today morning, then again - this week it will go round! Today, heating and plumbing, the bathtub and shower trays have been established. Sun looks now from:

down shower

above shower

and the 1.80 m Bath

course we have already dry sample location - the 10 cm Bath will be more money really be worth :-)

Then our friends started sanitary everything ready for the underfloor heating. Actually, yes they should ensure that Monday and Tuesday have time on Wednesday then should screed up. How our Construction manager but have told the floor layers time pressure and therefore begin Tuesday afternoon to ever upstairs. Well, now the sanitary guys have time pressure. Today I got on it first then the insulation. coils we have found no ... then they have to stop tomorrow, get ready.

Below is the insulation in the living room, not in HWR and bathroom set, but the living room closet is now:


And this is in the profile:



An old friend, or better, two old friends are recovered:

Our heating pump are back. They were already on 20 August has been delivered and then disappeared into the storage because it still does not make sense in the house. So guys , welcome back and getting good cooperation ...

Well, and a very special surprise for the day also had to offer, not only was that he announced, no, we can finally welcome the recent roller shutters in our house. True to the motto Football Number 12's just came in the second half the game. However, no one has been replaced, we're playing now containing with 12 "man" against the sun. But was otherwise a special productions, says at least the red list.

Saturday, September 11, 2010

Funniest Freshman Initiation

KW

Now that we have already received inquiries first, because if we were still alive or whether it is in the construction was progressing, now once again an update. Yes, we're still alive ... however, the building it goes ahead, we were just too much to do in order to report here, we have the house for a week even seen almost only in the dark, as you will remember the photos. But as owners we have of course always a flashlight in the car (with a ruler safely stowed in the glove compartment).

On Monday, we had initially with the Construction manager made. The three of us have again been in the kitchen and marveled at the different levels outlets. Well, the electrician came and then we asked them what was that the. Response of an electrician, "Oh, Friday I was trainee here was Apprentice." ??????? Do not you trainees monitor? Can you put the easy times as sockets? But anyway, that was corrected on Monday. In this picture from Wednesday you can see that it now looks better:

What you see in this picture also the electrical installation for the construction phase ended on Wednesday. All sockets are set and wired LAN cables are installed, switches and thermostats set ...

addition, the sanitary people have been diligently following pictures from Monday:

bathroom downstairs

bathroom upstairs

bathroom upstairs, next to shower, rear bath

The drywallers were busy. Upstairs there are now rooms :-)

Now we could finally see how great sometimes live above the premises, how dark or light it is actually in the dressing room (was not a window is However, enough light enters from the bedroom and the hallway inside her).

Here is a picture of the floor above. Left it goes into the dressing room, the center hole out to score first, then children and it goes right into the study. More pictures are not reasonable, as we have in the dark rather made sure to document all the wiring, etc.. As of Thursday

were then cleaner there. On Tuesday, we could see that the large silo " calved" (quote of the owner) has:


The walls are plastered now and we are thrilled with how smoothly everything is.

hall entrance

kitchen

living

window sills, we now also have


A corner it however also that is not ready yet, where you can see how the walls and walls with Viebrock are constructed:

Well , our shutter still missing - much to the delight of the drywall, which therefore again have to come back and Putzer, the the corner can render them completely. We are curious when the shutter comes ...

Soooo that has done everything that is inside. Outside, you can now admire taps and wall outlets and Mauer were again going to do about the "window sills" to the outside finished. Again a few impressions from the outside:



is next week then the outer coating and the grouting of clinker to . The team for the cleaning work is for Monday and Tuesday still stands on the schedule and at the end of the week the final installation electric on the program.

too, otherwise we've been busy, the moving truck is ordered, we wait for the revised offer of landscaping -maker and an offer of a second landscaping -Bauer, the outdoor lights have been ordered and delivered and we have to hope the fight Germany to have won with cable and get up with the house connections and our cable cable.

Saturday, September 4, 2010

How Do I Encrypt My Harddrive

Not everyone wants to make sales ...

.. at least today was our experience of the day.

But at times to start all over again: we are looking for lamps. For the living room and two bathrooms. Is not really easy, we know even now. The offer is huge, but the thing is not found yet.

But since we have already decided, at least in the living room for a "cable system" for the dining area ... we thought now time that we get "professional advice". About the Internet, we have therefore looked for a shop near us where you could help us secure the best. We thought ...

The dialogue between us and the Lord, we found there was something like this ... a little cut of course

"Tomorrow ... we need beautiful lamps for the living room and the bathroom"
"happy to have them already .. an idea "
" Yes were in the living room ... we like a cable system. "
" cable system? "
" Uh .. yes .. so ... cable system with two cables containing "
" Ah yes ... so I have not done that for at least 10 years. That makes today any more! "
" Oookaaay ... but we would also like to ... "
" What they need to do that? "

follows is a brief dialogue about how we wish to illuminate our living room and dining area if necessary . and the underlying "reading area" with the bookshelves. Then we propose the man a "Rail System" .. supposedly more flexible and better. And not out as the "cable system" which he has allegedly not done in 10 years . interesting is that he in his exhibition right next to Such a system is, while we of the disadvantages of our ideas at length told.

good .. But the rail system seemed to be so practical and chic .. it was. Worth a try we thought. We thought ...

"Then we try this with the rail system. We have already discussed with our Electricians the so that the outlet is located on one side of the wall. We're building that is straight and are in the construction phase."

(the man tormented by the dealer clears the face)

"But we can still change .. because we are flexible. We usually send the electrician is still a mail .."

(sighing when personnel) "Since they come far too late! Because they should have come much earlier to me. Because lighting consulting and such. And the outlet on the wall. It looks not at all. And as impractical. "

" Well ... you know how little time we have in our building? "

" It does not matter. Now they are too late! That would have been much longer time to discuss everything. How do they illuminate their rooms and so! This is now indeed no longer so true. Since they are really too late .. "

" Well .. we can still the chg ... "

" So the solution is to keep it for long ... and how does it look then! No ... so this is how it did not. "

He then tried on in a pushy arrogant way clear to us that what we have set ourselves in the head yes and yes would be complete nonsense would not look. Multiple was still repeated, that a cable system so totally "out" would be ..

We're both rather quiet people. We lie not with people who know about such things more than us. But the man did not go today. From the first time in his shop, we must defend ourselves and our ideas must be explained in an unfriendly tone of voice so that what we think of everything is crap. And yes, he wants to help us with tips ...

no thanks. What we have to threw his head as we left for the first time in our lives a shop with many oaths that I'll be better. Only this: It was hot and the man was not clear.

So I understand what service to another. We would also like to leave us so what "better" persuasion. We are there really not. After all, he understands about such things more than us. But his on art. Headmaster detention and gooey ... that is a thing!

But then we had some fun today, still, yet, The windows friends have today lodged a Saturday extra layer and assembled three of the four missing shutter boxes.

respect! On a Saturday. We have been astonished not bad when the car in his driveway was ...

As you can forgive even that window is still not finished ... so Monday is another day:)

But the lamp man .... I need a glass of red wine tonight, first to come down again .. .

Friday, September 3, 2010

Dezert Eagle Blueprint

The madness has caught us ...

... today is one of the days as they give to clients and must - a day of madness.

have this morning, we first learn why we do not have a top shutters. Well, it can be well "is clearly at an advantage who can read" summary. There was probably already shutters boxes. They needed on both sides trailer. Unfortunately, from the architectural drawing very clearly that there is only one side trailer. Well, that is too large. New ones have been ordered and should now come on Monday. Bring order but the schedule slightly in distress - but the guys can do it.

Then earlier today made closing time because once again a meeting with a gala Bauer to stand . This time again the first, we want to present his offer and his ideas. The drawing his ideas were really quite successful. want but if you see the sum is believed that we pave with gold - the individual items of the offer and make a reasonable impression of each.

addition, he does have a nice big terrace planned tja , but will as I say - the total paved area on the plot is unfortunately greater than that of B-Plan allowed ... let's see what he has to alternative ideas.

then again into the house. By Wednesday evening, had done nothing, but also corresponded to the schedule. After all, the already processed on Monday up to and including Wednesday. On Thursday it was obvious that the drywall had been at work, but unfortunately we were only there in the dark, so that an accurate assessment was not possible.

So today in Hellen One was immediately clear, it has been continued to work diligently. The stairs to the loft, the day before still lay in the living room was now in the ceiling to the attic. And below was already quite clear that the electrician had begun its work. So leave any room to make ever photos and check if everything is as promised with the electrician.

already in the hall, the first surprise, a thermostat ? According specifications is no heating in the hall? Well, the list of many questions to the site manager and the electrician set and proceeded to the kitchen. And there he was, the moment of madness - weakened by the offer of the Gala-Bauer was the view upon entering the room on the opposite wall. For the inclined Reader who may not know, of course, how the kitchen should look like this, following the agreement, our kitchen we is L-shaped and the wall to HWR (when to get into the left) and on the outer wall (the exact door opposite wall). On this wall is approximately in the middle of the oven, right and left of each stove desktop . About two working surfaces each has a double outlet provided. So for 3-Mix, kettle, toaster and what else could I need Sun Do all readers now have a rough idea in your head? Good. Then please compare with the following image and find the error:


Na what is striking when you look at the whole? Seen nothing? Then look again carefully.

Exactly, the two have different heights double sockets, exactly 5 cm difference. And why? I do not know ... also coming on the list for the electrician with the lack of sockets, so far only in installation plan for the kitchen, but are not in the kitchen. But one stands there and looks and looks again, and it is so different ... Wat the hell they was thinking?? And Rina , you are almost done but build with, we can borrow your ax, please, please?

Well, someday or even further into the living room, which is after all not better the longer you look on it - and since then only found a switch that was not quite as designed, but perhaps even makes sense. But we must also ask again. In any case, it looks nice in the living room now bustling of:


then to the ladder top.

So it looked earlier this week from the top:



And so now:


was insulated and laid up in the attic Rauhspund and cables hanging around and "Rails" for the walls are screwed up. Now you can finally see the size of the individual rooms.

The cables are all labeled, very exciting.



We then ventured sometimes to the attic. That was a really great feeling, because everything is so ready :-) For the interested co-owners, the loft building owner has -height, ie in the middle so about 1.80 m.

Last but not least for today, the evidence that work well for Viebrock ordinary artisans and people like us can live as an office man his prejudices:


But the basic idea we are now going to try and even the power outlets in the kitchen with a very tasty Italian red wine to forget - Thank you Thomas for this very tasty bottle!