This week was marked by much "action" on top and a very calm finish.

like last post was written on Monday and Tuesday, the sanitary guys on it and have baths, showers and underfloor heating installed. A yes there were some pictures on Monday already. From Tuesday

was then poured and the floor . First the top then the bottom and Wednesday. The following impressions are from Tuesday evening :


This plate kept us honest builders, of course, already out on Tuesday


The floor in the living room from the outside so ...

And top floor - good that the framework was still

Wednesday evening we found very pleased that now our clinker is also jointed. And therefore we were able to use the framework to use to fan the joints. At the same time we have with our new acquisitions, a spade and pruning shears are busy with our "garden". There is still work to be done and that there is a wide hedge of various shrubs and trees running diagonally across the site. This hedge comes from old times when the sites were designed in the development area or otherwise. Would be really handy if this would be the property line, but so, unfortunately, very impractical ...

Friday was then the scaffolding finally broken down and we were able to see our house for the first time free-standing.

Tadaaa :



Up close one can see how important the task of the coming week, namely the drainage. The rain of the day leads to an impressive reservoirs:

next week then the week of house connections, since your fingers crossed that everything works!

outer one can also recognize where the outdoor unit should get there the heat pump:


Inside we were of course today, as we have no longer held there. Puh , what is one Say that a sauna. The humidity caused by the screed has come into the house, is quite remarkable. The first thought when unlocking was "oh, that's really high now." Sun 20 cm on the bottom plate in addition to notes on it quite clearly.

Upstairs there are much less cm, but here you can see the ground up times good.

Our HWR also fills up more and more that black the way, is the cable from cable Germany that is then next weeks hopefully moved along with the house connections and we will deliver television, telephone and Internet.

Inside was also clear that still have the electrical installation missing, the sockets are still in plaster, is a switch box is not so still Let's see when that comes, not that we have first a household connection, and then until the cans are exposed ...

Well, what do we tell the clients actually the title of the blog entry ? Quite simply, we have used the Saturday to the hardware store our confidence some color samples and a role woodchip wallpaper bought - and then we painted. Just to even more than just little color cards have and imagine to how the colors appear on the surface. Zabayone has unfortunately lost, but Cotta and Cream please us very much for our bedroom. Let's see how we can find similar colors to the painter.

Oh, and plum cake is of course no color but just a reference to the fall. A wonderful smell of baking yesterday pulled through the apartment and tasty it is. If this smell attracts by our house we will live for many months there. The first Back is rather the smell of his Christmas cookies:)

The other schedule is otherwise as follows:
Next
40th week House connections KW tiles
41st KW Decorators
42nd KW wooden staircase, final installation electrical / heating / sanitation , interior doors
43rd KW Carpet Cleaning and snacks including (if only for that we love Viebrock !)
44th KW delivery, floor and kitchen
45th KW catchment

Wow, it's the opposite end :)))